We all know that the order of importance is very important in the renovation of new homes. In order, it will mean that you can perfectly complete the entire process, and the kitchen is the same. The kitchen is well decorated, not only makes us look comfortable and beautiful, but also will have more mood when eating. Below I simply introduce the order of the kitchen renovation .

Kitchen Renovation Order 1: Demolition

If it is for the transformation of old houses, the original tiles, ceilings, and lamps must be removed; if it is a new house reconstruction and you want to break the original kitchen pattern, you must also face the task of demolition.

Kitchen renovation sequence 2: waterway, circuit reconstruction

In general, most people will use the water circuit as a dark pipe, because it looks more beautiful. The water circuit is a hidden project, so it must not leave any security risks. Another important point is that in the process of hydropower reform, we must reserve the position of the socket.

Kitchen renovation sequence 3: wall surface, plaster leveling

After the wall surface is dismantled, the unevenness of the wall surface needs to be repaired, which is conducive to the next step of waterproof work.

Kitchen renovation sequence 4: do waterproof

Wait until after the cement is dry, brush the waterproof coating on the wall and floor two or three times. After 24 hours, you need to do a waterproof test.

Kitchen renovation sequence 5: tiling

Workers need special attention when tiling bricks. The floor that can finish waterproofing can walk, otherwise it will damage the waterproof layer and make waterproofing ineffective. The standard for the sticking of tiles is that the emptying drum must be <5%, and the difference between the two tiles at the diagonal corners is <2mm.

Kitchen renovation sequence 6: install ceiling, cabinets, lamps

After plastering the tiles, you can make a reservation for the master to install ceilings, cabinets, and fixtures.

Kitchen decoration notice

1. Lighting

In the choice of lamps and lanterns, mainly moistureproof, waterproof, easy maintenance and cleaning, such as: embedded LED panel ceiling lamps, ceiling lamps with waterproof interface.

2. Ground

In the choice of floor tiles, we must use non-slip, easy to clean, we must not underestimate the kitchen's "creative capacity."

3. Electric appliances

When decorating the kitchen, try to leave as many outlets as you can for the day. For example: microwave ovens, ovens, disinfection cabinets, etc., can be considered embedded design, saving space and tidy. From the choice of hood, according to personal habits, but must ensure strong smoking ability.

Editor's summary: The above is the introduction of the order of the kitchen renovation , the kitchen is the most filthy place, so the appliance must be selected to be easy to clean and waterproof, and the hood is not greedy, to ensure that smoking is the focus.

Kitchen renovation order

90 Degree Elbow

90 Degree Elbow,Stove 90 Degree Elbow,90 Degree Elbow Pipe,90 Degree Elbow Pvc

Jinan Huancheng Heating Equipment Manufacturing Co., Ltd. , https://www.globalstove.com