Hydroelectricity transformation process should be careful
General decoration companies will use the actual data on the site as the specific figures for the transformation of the water circuit. It is difficult to estimate the reason and refuse to tell you in advance how much money will be spent on the hydropower reform.
It is often the owners who arrive at the checkout and find that they have to pay more than three to four thousand yuan for this water circuit reconstruction project.
Countermeasures: Prior to the signing of the renovation contract, it is required to design the drawings for the production and water circuit transformation, and to strictly calculate the possible quantities of the following items against the drawings:
Telephone line transformation, transformation of power outlets, transformation of switch panels, waterway reconstruction, transformation of cable television lines, and transformation of network cables.
And calculate a reasonable fee for this. In this way, it is possible to avoid excessively high costs for water circuit renovations.
Water Circuit Modification Precautions:
1. PVC pipe is a material that is prohibited by the state as a water pipe. Never use it. Copper tubes are recommended.
2, dark trough: that is, all the lines are hidden in the wall inside, these on the wall to create a dark trough is used to put the circuit casing, the more expensive.
3, the open line: that is, the wire into the casing, hidden in the ceiling or under the floor tiles. The cost is relatively cheaper.
4, waterway design: First of all want to think of all the water-related equipment, such as: water purifiers, water heaters, kitchen treasures, toilets and wash basins, etc., their location, installation methods and where the need for hot water.
5, bathroom: In addition to leaving the wash basin, toilet, washing machine and other outlets, it is best to take one more tap, after washing the mop and other very convenient.
6, washing machine floor drain is best not to use deep water seal leakage, because the water is too slow to meet the needs of washing machines.
7, strong and weak wires can not be in the same pipeline, there will be interference.

Hydroelectricity Reconstruction Hydroelectricity Installation Toilet TV Decoration Decoration Socket Switch Toilet Ceiling Material Bathroom Design Toilet Ceiling Bathroom Wash Basin Toilet Tile

Plastic Geogrid

Plastic Geogrid,Steel Plastic Geogrid,Woven Geogrid

Non Woven Geotextile Co., Ltd. , http://www.nsgeotextile.com